Blog

Flatwork Complete - Lever Homes

We've recently completed the flatwork and are ready to start framing.  On a sustainable note, we had the pump truck unload the concrete spoils off-site.  This allows 100% of the ground outside of the building footprint to remain pervious, which in turn keeps more rainwater out of the storm system.

The gravel you see in the picture to the right is in place for the pervious pavers that will be installed as part of the landscaping.

Taylor Callaway